Haul roads

Hydrogel field trials: how long the dust stayed down

Hydrogel went into the water carts on haul roads at a gold mine in Mali, a diamond mine in Botswana, and a platinum mine, two coal mines and a lime mine in South Africa. On each road, the dust after watering with Hydrogel was compared with the dust after watering with water alone. Here is what each site found, how the dust was judged, and what the results depend on.

A water cart filling under a stand pipe, with a flowbin and a dosing pump next to it.
Hydrogel is dosed into the water cart at the fill point. Image is illustrative.

How the dust was judged

The sites judged the dust by eye, behind the haul trucks, on a five-degree scale published for mine haul roads:

  • Degree 1: minimal dust.
  • Degree 2: dust just visible behind the vehicle.
  • Degree 3: dust visible, but an oncoming driver is not troubled and can see well.
  • Degree 4: a lot of dust: an oncoming driver closes the windows, visibility is just acceptable and overtaking is hazardous.
  • Degree 5: heavy dust: windows closed, poor and hazardous visibility, no overtaking.

Most sites noted how long after watering the road took to reach a degree, and photographed the roads. Some also counted how many times a shift the water carts had to water the road.

A gold mine in Mali

The mine’s haul roads are long, the dry season is hot, and its water carts could not keep up: the operators said water alone did not last one cycle of the cart. Hydrogel was added at the carts’ fill point, on the same roads, with the same carts and the mine’s own operators.

What the trial showed, and the programme planned from it:

  • Start with a clean road. The plan was to grade the road lightly first to take off the loose fines, and to start with a heavier application than the routine ones.
  • Watch the edges. Fines from the service road and from the build-up on the shoulders came back onto the haul road, so the plan was to grade the shoulders and treat the service road with Hydrogel too.
  • Match the passes to the weather. More on hot days, fewer on overcast days and at night, with a gap between passes.
  • The mine’s own operators can run it. The site’s water-cart operators proved able to run the programme without a permanent 88Chemco person on site.

A diamond mine in Botswana

Here Hydrogel went onto haul roads and onto a new pit ramp, beside roads watered with water alone, to make the mine’s water go further.

On the roads kept on a continuous Hydrogel programme, the road surface became noticeably darker.

A platinum mine in South Africa

For a mining engineering dissertation, a haul road at a platinum mine was watered with water alone and then with Hydrogel in the water truck, and each time the road was watched until the dust passed degree 3, the point the study took as the end of an effective watering. The water truck’s cycles in a day shift were counted before and after.

The same study carried the site’s figures over a whole year, as a model. Its two outputs are estimates, not measurements, and are labelled so:

Where the platinum mine’s results come from

Sebastian Karsas, B.Eng (Mining Engineering), University of Pretoria, 2017: Using a mobile dust monitor to measure dust control efficiency for comparison of dust suppression palliatives. Dissertation.

Dissertation, web edition (PDF, 2.3 MB)

Two coal mines in South Africa

At the first, a haul road was photographed after each kind of watering over a week, and the water carts’ work was worked out from the times. At the second, the water carts had been watering a haul road every hour.

A lime mine in South Africa

At a lime mine, a road was photographed after a watering with water alone, and again after a watering with Hydrogel.

What these results can and cannot tell you

These were working trials on running mines, not laboratory studies. The sites compared roads on different days or on neighbouring roads, judged the dust by eye and photographed it, while the weather, the traffic and the road material changed between readings. So each result is given with where and how it was found, and what it depends on. Together they give the range we state for Hydrogel:

Your own result depends on your roads. To test Hydrogel on your own roads, see How to run a fair haul road dust control trial, and send us the roads, the water carts and how often they water now.

How Hydrogel went on in the trials

As it goes on at any site: dosed into the water cart at the fill point, by a dosing pump, by a timer-controlled pump or by hand from 20 L containers, before the cart fills with water. The cart then waters as usual. We advise the dose for your site.

Questions about the Hydrogel trials

How long does Hydrogel keep a haul road’s dust down?

It depends on the road material, the traffic and the weather. Each site’s result, how it was judged and what it depends on, is given above.

Who ran the Hydrogel trials?

The roads, the water carts and the operators were the mines’ own; 88Chemco set up the dosing and gave technical support.

Can we test Hydrogel on our own haul roads?

Yes. Send us the roads, the water carts and how often they water now, and we advise the dose and how to set up a fair comparison with water alone.

Is Hydrogel a road binder?

No. Hydrogel is a polymer-based water extender: it holds the water on the road for longer. A binder, such as DustBinder Lignin or DustBinder Bitumen, binds the fines into the road surface. See Choosing a haul road dust control method.

Sources

  • The five-degree dust scale: Journal of the Southern African Institute of Mining and Metallurgy, vol. 107, July 2007, pp. 435 to 450. SAIMM (PDF).
  • The trial records: the sites’ times, counts and photographs from before 2017, the summaries 88Chemco made from them, and a 2017 mining engineering dissertation (the mines are not named).

Contact

Tell us what you need.

Tell us the product, the quantities, the mine or site and its country, and the date you need it. Holding an RFQ or tender? Send it whole, and we reply to every line we supply.

Prices and deliveries outside South Africa are quoted with each order.

Request a quote WhatsApp